Biomassza fűtőművek
Heating plant of Győr - 2013
Preparation of the feasibility study and general design for the heating plant of 13 MW fired by wooden chips and straw to be connected to the heating plant of Győr. During the project our task was to carry out the general design work of the heating plant’s building as well as to prepare the tender of the project.
Heating plant of Mohács - 2011
A biomass heating plant of 4.5 MW. During the project our task was to carry out the general design work, to prepare the project tender and to compile the feasibility study.
District heating plant of 3MW in Miskolc - 2010
Carrying out tender engineering tasks and the general design of a biomass-fired district heating facility with a heating performance of 3 MWV connected to the district heating system of the city.