Projektleírás

Following the creation of the detailed designs of Phase I we designed the complete building engineering systems of Phase II of the factory of FAG in Debrecen, Hungary. In addition to the mechanical engineering supply systems for the technology our task included designing the technological pipe grids and industrial gas grids.

Due to the technology, which involves oil, we had to pay particular attention to the air quality of the factory hall and ensuring that air handling units can operate in such an environment. Accordingly, special air handling units had to be designed.

Részletek

Szerződés tárgya:
Detailed design of the complete building technology
Helyszín:
Debrecen, Hungary
Évszám:
2016

Jellemzők

Detailed design of the complete building technology:
low- and medium-voltage systems, weak-current systems, building engineering, mechanical engineering automation, technological systems

Képek a projektről

További projektek

Helyszín: Miskolc, Hungary
Év: 2014-2015
The airbag manufacturer Takata-Petri built its new factory in Miskolc, and our company was responsible for the design of the entire building technology during the tender phase.
Helyszín: Dunaharaszti, Hungary
Év: 2013
The establishment of the aseptic production line included the design of the mechanical utility systems for sterile product technology.
Helyszín: Uppsala, Sweden
Év: 2006
3D design of pharmaceutical technology plant, using the MicroStation TriForma and Bentley Plant Space Design Series software