Project Description

Complete building engineering design in the technological and comfort areas. Design of new development building, including the design of mechanical engineering supply systems for the technological systems.

Details

Subject of the Contract

Complete building engineering

Location:

Kecskemét, Hungary

Year:

2013

Features

Complete building engineering: comfort ventilation and extraction systems, heating/cooling, water supply and sewerage, gas supply, compressed air system, heat recovery system.

Pictures about the Project

More Projects

Location: Budapest, Hungary
Year: 2016-2021
ETELE Plaza is the newest shopping center in Újbuda. The design of the building began in 2016, construction started in 2018, and it has been in operation since autumn 2021.
Location: Dunaharaszti, Hungary
Year: 2013
The establishment of the aseptic production line included the design of the mechanical utility systems for sterile product technology.
Location: Szolnok, Hungary
Year: 2014
Recommissioning three existing wells and the design and construction of the new water treatment facility.

© All rights reserved 2026 Körös-Consult Zrt.