Project Description

The creation of aseptic production lines involved designing the mechanical engineering supply systems for the technological systems of the sterile product.

Construction of a stainless steel cabin, with a stainless steel pipe system and sterile air exchange system were fundamental requirements. Our task was to design and handle the licensing procedure for the new compressor and steam boiler

Details

Subject of the Contract

Complete architectural, structural, climate technology and process design

Location:

Dunaharaszti, Hungary

Year:

2013

Features

Complete architectural, structural, climate technology and process design: architectural and structural design of the aseptic cabin, comfort ventilation and extraction for processes, heating/ cooling, sanitation, pipe grid, gas supply, industrial gases, industrial cooling, compressed air system, steam system (basic and sterile), public utility design

Pictures about the Project

More Projects

Location: Szolnok, Hungary
Year: 2014
Recommissioning three existing wells and the design and construction of the new water treatment facility.
Location: Kecskemét, Hungary
Year: 2013
Complete building engineering: comfort ventilation and extraction systems.
Location: Pécs, Hungary
Year: 2010
Concert hall whose design makes it also suitable for conferences and balls.

© All rights reserved 2025 Körös-Consult Zrt.