Project Description

Complete building engineering design in the technological and comfort areas.

Complete design of the mechanical engineering, technological steam supply, and public utilities of the factory and the warehouse.

Details

Subject of the Contract

Complete building engineering design

Location:

Dunaharaszti, Hungary

Year:

2005

Features

Complete building engineering design:
comfort ventilation and extraction systems, heating/cooling, water supply and sewerage, gas supply, steam supply, compressed air system, heat recovery system

Pictures about the Project

More Projects

Location: Uppsala, Sweden
Year: 2006
3D design of pharmaceutical technology plant, using the MicroStation TriForma and Bentley Plant Space Design Series software
Location: Budapest, Hungary
Year: 2016
Building engineering design, design of the automatic fire suppression system.
Location: Indonesia – Sumatra, Java, Sulawesi – 34 sites
Year: 2015-2017
Construction of high performance water pumps and complete water treatment plants on 3 islands, 34 sites in Indonesia.

© All rights reserved 2025 Körös-Consult Zrt.