Project Description

The design task concerned the mechanical engineering design of the entire project, including heating, comfort cooling, and ventilation systems. The design of the building began in 2015.

The project is being carried out in several phases: completion of Phase I is expected for the end of 2017.

The building is being constructed with BREEAM certification, for which we participated in mechanical engineering tasks.

Details

Subject of the Contract

Mechanical engineering design

Location:

Budapest, Hungary

Year:

2016

Features

Mechanical engineering design: complete building engineering design of an 80,000 m2, Category “A” office building

Pictures about the Project

More Projects

Location: Budapest, Hungary
Year: 2022
Special mechanical engineering solutions, whose implementation posed significant engineering challenges and required extensive teamwork.

V43

Location: Budapest, Hungary
Year: 2016
BREEAM certificated building, for which we participated in mechanical engineering tasks.
Location: Dunaharaszti, Hungary
Year: 2013
The establishment of the aseptic production line included the design of the mechanical utility systems for sterile product technology.

© All rights reserved 2025 Körös-Consult Zrt.