Projektleírás

Following the creation of the detailed designs of Phase I we designed the complete building engineering systems of Phase II of the factory of FAG in Debrecen, Hungary. In addition to the mechanical engineering supply systems for the technology our task included designing the technological pipe grids and industrial gas grids.

Due to the technology, which involves oil, we had to pay particular attention to the air quality of the factory hall and ensuring that air handling units can operate in such an environment. Accordingly, special air handling units had to be designed.

Részletek

Szerződés tárgya:
Detailed design of the complete building technology
Helyszín:
Debrecen, Hungary
Évszám:
2016

Jellemzők

Detailed design of the complete building technology:
low- and medium-voltage systems, weak-current systems, building engineering, mechanical engineering automation, technological systems

Képek a projektről

További projektek

Helyszín: Indonesia – Sumatra, Java, Sulawesi – 34 sites
Év: 2015-2017
Construction of high performance water pumps and complete water treatment plants on 3 islands, 34 sites in Indonesia.
Helyszín: Szolnok, Hungary
Év: 2014
Recommissioning three existing wells and the design and construction of the new water treatment facility.
Helyszín: Various locations
Év: 2009-
Design and implementation of complex water treatment and building services engineering projects for industrial and drinking water applications.