Project Description

Following the creation of the detailed designs of Phase I we designed the complete building engineering systems of Phase II of the factory of FAG in Debrecen, Hungary. In addition to the mechanical engineering supply systems for the technology our task included designing the technological pipe grids and industrial gas grids.

Due to the technology, which involves oil, we had to pay particular attention to the air quality of the factory hall and ensuring that air handling units can operate in such an environment. Accordingly, special air handling units had to be designed.

Details

Subject of the Contract

Detailed design of the complete building technology

Location:

Debrecen, Hungary

Year:

2016

Features

Detailed design of the complete building technology:
low- and medium-voltage systems, weak-current systems, building engineering, mechanical engineering automation, technological systems

Pictures about the Project

More Projects

Location: Budapest, Hungary
Year: 2016
Mechanical engineering design of the entire project, including heating, comfort cooling, and ventilation systems.
Location: Kecskemét, Hungary
Year: 2009-2024
We were involved in the preparation of permit, construction, installation and implementation plans for WERK1-2 projects, as well as site engineering tasks.
Location: Budapest, Hungary
Year: 2016
Building engineering design, design of the automatic fire suppression system.

© All rights reserved 2025 Körös-Consult Zrt.