Project Description

From April 2013 the water quantity produced by the wells started to drop. The missing quantity was supplied from the grid. This trend led to shutting down even the last well in October
2013. Since then, the meat plant has been meeting its water demand exclusively from the grid.

During the recommissioning the main problem to be solved was the high concentration of iron, manganese, and ammonium in two of the three wells, and the high arsenic content in one well. In addition, water in all three wells has a high Na content.

Details

Subject of the Contract

Recommissioning the existing wells, design and construction of a new facility

Location:

Szolnok, Hungary

Year:

2014

Features

Recommissioning three existing wells and the design and construction of the new water treatment facility (1,920 m2 including the area of the wells, water treatment facility, storage tank, and water tower)

Pictures about the Project

More Projects

V43

Location: Budapest, Hungary
Year: 2016
BREEAM certificated building, for which we participated in mechanical engineering tasks.
Location: Budapest, Hungary
Year: 2016-2021
ETELE Plaza is the newest shopping center in Újbuda. The design of the building began in 2016, construction started in 2018, and it has been in operation since autumn 2021.
Location: Budapest, Hungary
Year: 2022
Special mechanical engineering solutions, whose implementation posed significant engineering challenges and required extensive teamwork.

© All rights reserved 2025 Körös-Consult Zrt.