Project Description

The creation of aseptic production lines involved designing the mechanical engineering supply systems for the technological systems of the sterile product.

Construction of a stainless steel cabin, with a stainless steel pipe system and sterile air exchange system were fundamental requirements. Our task was to design and handle the licensing procedure for the new compressor and steam boiler

Details

Subject of the Contract

Complete architectural, structural, climate technology and process design

Location:

Dunaharaszti, Hungary

Year:

2013

Features

Complete architectural, structural, climate technology and process design: architectural and structural design of the aseptic cabin, comfort ventilation and extraction for processes, heating/ cooling, sanitation, pipe grid, gas supply, industrial gases, industrial cooling, compressed air system, steam system (basic and sterile), public utility design

Pictures about the Project

More Projects

Location: Dunaharaszti, Hungary
Year: 2005
Complete building engineering design in the technological and comfort areas.
Location: Budapest, Hungary
Year: 2016-2021
ETELE Plaza is the newest shopping center in Újbuda. The design of the building began in 2016, construction started in 2018, and it has been in operation since autumn 2021.
Location: Debrecen, Hungary
Year: 2016
Following the creation of the detailed designs of Phase I, we designed the complete building engineering systems of Phase II of the factory of FAG.

© All rights reserved 2025 Körös-Consult Zrt.