Projektleírás

Our company participated in the building permit process for the Werk1 TGA (MEP) systems and the localization of the construction documents, acting as the Hungarian partner of a German design firm. On behalf of Kraftszer, we prepared the installation drawings for the WERK1 energy center, and as part of the contract, we are providing site engineering services.

In addition, we prepared installation and as-built drawings for several other buildings. During the Werk2 expansion, we developed the detailed construction plans for the new *Rohbau* building on behalf of ATP/MBT, and we also prepared the installation and as-built drawings for this building for KÉSZ Zrt.

Részletek

Szerződés tárgya:
HVAC systems design
Helyszín:
Kecskemét, Hungary
Évszám:
2009-2024

Jellemzők

Our colleagues’ advanced German language skills facilitated effective collaboration with the client (project engineer, construction manager). We are equipped with specialized design software that complies with Mercedes’ relevant standards (MicroStation).

Képek a projektről

További projektek

Helyszín: Kecskemét, Hungary
Év: 2013
Complete building engineering: comfort ventilation and extraction systems.
Helyszín: Debrecen, Hungary
Év: 2016
Following the creation of the detailed designs of Phase I, we designed the complete building engineering systems of Phase II of the factory of FAG.
Helyszín: Szolnok, Hungary
Év: 2014
Recommissioning three existing wells and the design and construction of the new water treatment facility.