Project Description

Central heating and sanitary hot water production from the district heating supply, in order to reduce harmful local emissions.

Ventilation system regulated in terms of CO2 concentration, supplying the air quantity in line with the needs of offices. The building is being constructed with BREEAM certification, for which we participated in mechanical engineering tasks.

Details

Subject of the Contract

Complete mechanical engineering design

Location:

Budapest, Hungary

Year:

2016

Features

Complete mechanical engineering design of a 12,000 m2, Category “A” office building

Pictures about the Project

More Projects

Location: Indonesia – Sumatra, Java, Sulawesi – 34 sites
Year: 2015-2017
Construction of high performance water pumps and complete water treatment plants on 3 islands, 34 sites in Indonesia.
Location: Szolnok, Hungary
Year: 2014
Recommissioning three existing wells and the design and construction of the new water treatment facility.
Location: Budapest, Hungary
Year: 2022
Special mechanical engineering solutions, whose implementation posed significant engineering challenges and required extensive teamwork.

© All rights reserved 2025 Körös-Consult Zrt.