Szolnok / Hungary – Kaiser Food Ltd. (2014)

Ensuring a daily water demand of 900 m³ from newly installed wells, treated to drinking water quality – design and implementation.

Környe / Hungary – Bridgestone (2013–2014)

2×25 m³ reverse osmosis units with activated carbon filtration and twin-column water softener, dosing of phosphate, corrosion inhibitor and oxygen scavenger – tender and execution design for various technological demands (steam boilers, cooling towers, water spraying).

Tengiz / Kazakhstan – Tengizchevroil (2010)

Comprehensive building services design: comfort and process ventilation, heating–cooling, drinking water supply, sewerage, gas supply. Water treatment and pipeline design for 2000 m³/day demand of workers’ accommodation.

Budapest / Hungary – Dreher Breweries Ltd. (2010)

Renovation of drinking water wells and design of a 7 km transmission pipeline to ensure 2500 m³/day water demand.

Hungary – Tesco Stores (2009–2010)

Design of water treatment systems for groundwater-based supply serving cooling, irrigation and flushing water needs.

Moscow / Russia – Nidan Canning Factory (2006)

Using existing wells to meet 3000 m³/day industrial, technological and steam supply water demand with complete water treatment.

Képek a projektekről

További projektek

Location: Dunaharaszti, Hungary
Year: 2005
Complete building engineering design in the technological and comfort areas.
Location: Miskolc, Hungary
Year: 2014-2015
The airbag manufacturer Takata-Petri built its new factory in Miskolc, and our company was responsible for the design of the entire building technology during the tender phase.
Location: Kecskemét, Hungary
Year: 2009-2024
We were involved in the preparation of permit, construction, installation and implementation plans for WERK1-2 projects, as well as site engineering tasks.